San Juan School

Built

The proposal is formed by a built perimeter and two central axes that cross. This form four separate courtyards that are at different levels, in line with its natural terrain. The courtyards are designed according to the perimeter enclosures that shape and control the access of students and visitors, the main entrance is the only public access.

  • Location
    Lampa
    | Metropolitan Region | Chile
  • Client
    Fundación Astoreca
  • Project Year
    2012
  • Construction Year
    2014
  • Site Area
    15.000 m²
  • Built Area
    7.200 m² (4.600 Stage I; 2.600 Stage II)
  • Structural Engineering
    Ingev
  • General Contractor
    DLP
  • Materials
    Reinforced concrete | Metal structure